Better version CRC3

Gough CAT Component Rebuild Centre

Cequent Projects managed every aspect of this project from concept, feasibility, site selection and resource consents, through to design and construction of this 2000m² high specification facility.  The unique workshop includes 18 cranes, a 3000hp engine dyno and transmission test cells. It is a fully sealed, clinically clean and dust free pressurised environment, with rapid rise roller doors and post tensioned, joint free polished concrete floors.

Construction of a high spec workshop, to achieve an international 5 star Caterpillar rating 

back